Division 23 - Heating, Ventilating, and
Air-Conditining (HVAC)


Section
No.

Section Name

Revision
Date


** NOTE ** Please refer to the Technical Design Requirements for Alberta Infrastructure Facilities,  for additional requirements. Any questions please contact Cam Munro at cam.munro@gov.ab.ca or 780-422-7456
23 01 30B.doc Duct System Cleaning 2010-12-31
23 07 00B.doc Ductwork and Breeching Insulation 2015-12-09
23 08 13B.doc General Mechanical Starting and Testing Requirements 2010-12-31
23 08 23B.doc Mechanical Equipment Starting and Testing 2010-12-31
23 08 33B.doc Mechanical Systems Starting and Testing 2010-12-31
23 08 43B.doc Pressure Testing 2016-12-21
23 08 83B.doc Balancing and Adjusting of Mechanical Equipment and Systems 2014-12-16
23 08 93B.doc Mechanical Equipment and Systems Demonstration and Instruction 2010-12-31
23 08 95B.doc EMCS Start-Up and Testing 2013-06-01
    23 09 10B.doc Control Systems 2010-12-31
23 09 23B.doc EMCS General Requirements 2013-06-01
23 09 24B.doc EMCS Network Communications and System Configuration 2013-06-01
23 09 25B.doc EMCS Central/Portable Control Stations and Peripherals 2013-06-01
23 09 26B.doc EMCS Remote Control Units 2013-06-01
23 09 27B.doc EMCS Terminal Control Units 2013-06-01
23 09 28B.doc EMCS Field Work 2013-06-01
23 09 29B.doc EMCS Sensors, Devices and Actuators 2013-06-01
23 09 30B.doc EMCS Point Schedules 2013-06-01
23 09 93B.doc EMCS Control Squences 2013-06-01
    23 10 10B.doc Service Station Fuel Dispensing System 2010-12-31
23 25 01B.doc Cleaning and Chemical Treatment Equipment 2013-04-04
      23 25 01.01.pdf  Chemical Pot Feeder and Corrosion Coupon Rack 2012-09-20
      23 25 01.02.pdf  Installation of Chemical Pot Feeder, By-pass Filter, Corrosion Coupon Rack, and Sample Cooler 2012-09-20
      23 25 01.03.pdf  Installation of Chemical Metering System for Steam Boilers 2013-03-19
      23 25 01.04.pdf  Installation of Corrosion Coupon Rack, Chemical Metering System and Total Dissolved Solids Control System for Condenser Water System 2012-09-20
      23 25 01.05.pdf  Installation of Corrosion Coupon Rack, Chemical Metering System and Total Dissolved Solids Control System for Evaporative Condenser Water System 2012-09-20
23 25 01.06.pdf  Packaged Steam Humidification System 2013-03-19
23 25 02B.doc Cleaning and Chemical Treatment - General Requirements 2013-04-04
23 25 13B.doc Cleaning and Chemical Treatment of  Hydronic Systems 2012-09-20
23 25 19B.doc Cleaning and Chemical Treatment of Steam Boiler Systems 2013-04-04
23 25 20B.doc Cleaning and Chemical Treatment of Condenser Water Systems 2012-11-09
23 25 26B.doc Cleaning and Chemical Treatment of Glycol Systems 2012-11-09
23 31 13B.doc Ductwork 2010-12-31
23 31 30B.doc Ductwork Accessories 2010-12-31
23 34 00B.doc Fans 2010-12-31
23 36 00B.doc Terminal High Velocity Units 2010-12-31
23 37 10B.doc Air Outlets 2010-12-31
23 42 00B.doc Particulate Air Filters 2010-12-31
23 51 00B.doc Breeching and Chimneys 2010-12-31
23 52 16B.doc Condensing Boilers 2013-11-08
23 52 23B.doc Cast Iron Boilers 2010-12-31
23 52 33B.doc Water Tube Boilers 2010-12-31
23 52 34B.doc Packaged Steel Watertube Boilers 2010-12-31
23 52 39B.doc Packaged Steel Fire Tube Boilers 2010-12-31
23 54 16B.doc Forced Air Furnaces 2010-12-31
    23 55 01B.doc Direct Fired Units 2010-12-31
    23 57 00B.doc Heat Exchangers 2010-12-31
    23 61 16B.doc Reciprocating Refrigeration Compressor 2010-12-31
    23 63 13B.doc Air Cooled Condensing Units 2010-12-31
    23 63 14B.doc Air Cooled Refrigerant Condensers 2010-12-31
23 64 05B.doc Chiller Upgrading - Purge Unit and Pressure Relief Valve 2010-12-31
23 64 13B.doc Absorption Water Chillers 2010-12-31
23 64 16B.doc Centrifugal Water Chillers 2013-11-08
23 64 19B.doc Reciprocating Water Chillers 2010-12-31
23 65 13B.doc Induced Draft Cooling Tower 2010-12-31
23 65 16B.doc Blow Through Cooling Tower 2010-12-31
    23 73 10B.doc Air Handling Units 2013-11-06
23 73 13B.doc Custom Outdoor Pre-manufactured Air Handling Units 2013-10-21
23 73 23B.doc Custom Indoor Pre-manufactured Air Handling Units 2013-11-08
    23 74 50B.doc Air Cooled Packaged Chillers 2010-12-31
    23 81 05B.doc Variable Speed Drives in Packaged Systems 2010-12-31
23 81 13B.doc Packaged Terminal Air Conditioning Units 2010-12-31
    23 81 19B.doc Packaged Roof Top Heating / Cooling Units 2013-11-08
    23 81 20B.doc Unitary Air Conditioners 2010-12-31
23 81 23B.doc Computer Room Air Conditioning Unit 2010-12-31
    23 82 05B.doc Terminal Heat Transfer Units 2010-12-31
    23 82 10B.doc Coils 2010-12-31
    23 82 26B.doc Induction Units

2010-12-31

23 83 00B.doc Radiant Heaters

2010-12-31

23 84 13B.doc Evaporative Pan Humidifier

2010-12-31

23 84 14B.doc Steam Grid Humidifier 2010-12-31
23 84 15B.doc Evaporative Humidifier 2010-12-31
23 84 16B.doc Sprayed Coil Dehumidifier 2010-12-31
    23 84 93B.doc Cleaning and Chemical Treatment of Air Washer Re-circulating Humidier Systems

2010-12-31


Division | 00 | 01 | 02 | 03 | 04 | 05 | 06 | 07 | 08 | 09 | 10 | 11 | 12 | 13 |
| 20 | 21 | 22 | 23 | 26 | 27 | 28 | 31 | 32 | 33 | Owned Infrastructure |

To save a document to your hard drive without opening it, right-click on the hypertext link and select "Save Target As..."