Technical Resource Centre - Buildings
Division | 00 | 01 | 02 | 03 | 04 | 05 | 06 | 07 | 08 | 09 | 10 | 11 | 12 | 13 |
| 20 | 21 | 22 | 23 | 26 | 27 | 28 | 31 | 32 | 33 | Owned Infrastructure |

 

Technical
Specifications

Division 31 - Earthwork


Section
No.

Section Name

Revision
Date


** NOTE ** Please refer to the Technical Design Requirements for Alberta Infrastructure Facilities,  for additional requirements. Any questions please contact Cam Munro at cam.munro@gov.ab.ca or 780-422-7456
31 00 10B.doc Earthwork Testing 2018-08-15
31 05 13B.doc Fill Materials 2018-08-15
31 10 00B.doc Site Clearing 2018-08-15
31 20 10B.doc Earthwork General Requirements

2018-08-15

31 21 13B.doc Radon Mitigation Rough-in System 2018-06-06

 

31 23 10B.doc Site Excavating, Filling and Grading 2018-08-15
31 23 16B.doc Building and Structure Excavating 2018-08-15
31 23 18B.doc Rock Excavating 2018-08-15
31 23 35B.doc Building and Structure Backfilling 2018-08-15
31 23 38B.doc Trench Excavating and Backfilling 2018-08-15
31 32 13B.doc Soil Cement Base Course 2018-08-15
31 62 13B.doc Cast-in-Place Concrete Piles 2018-08-15
31 62 18B.doc Driven Steel Piles 2018-08-15
31 62 19B.doc Timber Piles 2018-08-15
31 66 15B.doc Helical Screw Piles 2018-08-15

Division | 00 | 01 | 02 | 03 | 04 | 05 | 06 | 07 | 08 | 09 | 10 | 11 | 12 | 13 |
| 20 | 21 | 22 | 23 | 26 | 27 | 28 | 31 | 32 | 33 | Owned Infrastructure |

To save a document to your hard drive without opening it, right-click on the hypertext link and select "Save Target As..."